Tonight, we finished Baker’s Produce. We built the clerestory, gluing the four walls, adding the six windows, and gluing a tarpaper roof onto it. The building of the clerestory was a pain since I wrongly assumed both of the longer walls were of equal height. But due to the slight slant of the roof, one wall is slightly shorter than the other (and, I had to do a do over while gluing the walls of … [Read more...]
Initial build of Goober’s Towing from KC Workshop
August 2, 2018 By
Started this kit tonight, took less than 2 hours to get this far. Braced the interior walls, primed the exterior walls with gray primer. Dry brushed on the green paint, put some “white” on a sponge and splotged / textured the green paint, weathering it. Glued on acetate onto the interior walls over the window areas. Somehow, in the last several kits I started putting the acetate on the interior … [Read more...]