Well, I’m calling “Starman’s Spindles” pretty much completed. This evening, I added the roof top sign, the front sidewalk, and a company sign on the back of the building. The kit came with the casting of a pile of leftover debris that I added some “color” to since it was just gray straight out of the kit box. Eventually, once I move these buildings onto a scene/diorama, the debris will sit nearby this structure. The only thing I’ve not done is to “install” the two overhead lights over the two doorways. If I ever get around to doing that, I’m not going to take any pics of that. I believe these are the final pics for this building/album.
This structure took a duration of one month to complete – but, effort-wise, probably about a week or two of effort.
[slideshow_deploy id=’5811′]