After not touching this project for the last week or so, as soon as I got home tonite, I sat down at the project table and started working on this effort again. Finished all the shingling of the front and rear main roofs, shingled the two dormers (front/rear) and glued them on. Added rolled tar […]
Structures on Hold
Build of Shipyard Brewery – 5 of 6
Worked on shingling the main roof tonight. Also, built the dormer (both front and rear), as well as the two clerestory things. You can see the front dormer and the front clerestory here on the shingled front roof. Still have to shingle the rear main roof, then glue on the rear dormer and rear clerestory. […]
Build of Shipyard Brewery – 4 of 6
Added the roofs and tarpapered them, for the two extensions, and for the two enclosed exterior staircases. Still need to weather them. Added a middle vertical “plank” to each end to cover up the seams that were created when I joined the front half to the rear half. Shouldn’t point this out, while it looks […]
Build of Shipyard Brewery – 3 of 6
Getting there. Glued on the barn doors (and funky windows) to both of the “extensions”, then glued on the two extensions to the building itself (one in front, one on left side). Glued on the two exterior enclosed staircases (one in front, the other on right side). Not happy with the back of the side […]
Build of Shipyard Brewery – 2 of 6
Weathered the rest of the walls tonight, painted, then stained and then glued on the windows (all 22 of them), glued one side/end wall to the front wall, and one side/end wall to the rear/back wall. Now need to glue each “L” section to each other, forming the building rectangle. The roof is just mocked […]