• Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Brian's New Attitude

Alive and well

  • The Blog
    • Excerpts
    • Post list
    • topic: Activities
      • Blog / Website
      • Grad Studies
      • Model Railroad
      • ToastMasters
      • etc. (Activities)
    • topic: Career
      • Unisys
      • Post Unisys
    • topic: Interests
      • Music
      • Photography
      • Reading
      • Software Dev.
      • Technology
      • etc. (Interests)
    • topic: Miscellaneous
      • Lailah
      • Important People
      • Politics
      • 2016 Election / Donald Trump
      • etc. (Misc)
    • topic: Structure Building
      • Structures in Progress
        • 4th Street Bail Bonds
        • Gravely Building
      • Structures Built – 2020
        • Deignan’s Carwash
      • Structures Built – 2019
        • Shaw’s Ridge Equipment
      • Structures Built – 2018
      • Structures Built – 2017
      • Structures on Hold
    • Tabbed Topics
      • Activities (tabbed)
      • Career (tabbed)
      • Interests (tabbed)
      • Misc. (tabbed)
      • Structure Building (tabbed)
  • Pages
    • About BigB
      • Bucket List
      • Career Summary
      • Application Essay – Graduate Program in Software
      • Fav TV Series
      • Music shelf
      • My Projects
      • Places I’ve lived
    • Library
      • Favorite Authors
      • Reading Now
      • To start, or, on hold [by author]
      • To buy [by author]
      • Already read [by title]
      • Model Railroading Books
    • Model Railroading
      • Design Element Ideas
        • Victoria Falls Slide Show
      • Layout Plans
      • Layout Construction
      • Locomotives & Passenger Trains
      • Structure Kits
    • Photo Gallery
      • Lailah-2016
      • Lailah-2015
      • Lailah-2014
      • Lailah-2013
      • Lailah-2012
    • Technology Shelf
    • zDemo
      • Page Layouts
        • Content/Sidebar
        • Sidebar/Content
      • Columns Page
      • Landing Page
      • Sub Page 1.1
      • Typography
  • Home
    • home: Posts Summary
    • home: Featured Excerpts (by topic)
    • home: Recent Excerpts
    • GoodReads
    • home: Photo gallery
    • home: About GranPaBrian
  • Site Map
You are here: Home / Archives for Structure Model Building / Structures on Hold

Structures on Hold

Jan 30 2018

Build of Shipyard Brewery – 6 of 6

After not touching this project for the last week or so, as soon as I got home tonite, I sat down at the project table and started working on this effort again. Finished all the shingling of the front and rear main roofs, shingled the two dormers (front/rear) and glued them on. Added rolled tar […]

Written by bswadmin · Topics: Model Railroad, Structure Model Building, Structures on Hold · Tagged: Shipyard Brewery

Jan 21 2018

Build of Shipyard Brewery – 5 of 6

Worked on shingling the main roof tonight. Also, built the dormer (both front and rear), as well as the two clerestory things. You can see the front dormer and the front clerestory here on the shingled front roof. Still have to shingle the rear main roof, then glue on the rear dormer and rear clerestory. […]

Written by bswadmin · Topics: Model Railroad, Structure Model Building, Structures on Hold · Tagged: Shipyard Brewery

Jan 17 2018

Build of Shipyard Brewery – 4 of 6

Added the roofs and tarpapered them, for the two extensions, and for the two enclosed exterior staircases. Still need to weather them. Added a middle vertical “plank” to each end to cover up the seams that were created when I joined the front half to the rear half. Shouldn’t point this out, while it looks […]

Written by bswadmin · Topics: Model Railroad, Structure Model Building, Structures on Hold · Tagged: Shipyard Brewery

Jan 15 2018

Build of Shipyard Brewery – 3 of 6

Getting there. Glued on the barn doors (and funky windows) to both of the “extensions”, then glued on the two extensions to the building itself (one in front, one on left side). Glued on the two exterior enclosed staircases (one in front, the other on right side). Not happy with the back of the side […]

Written by bswadmin · Topics: Model Railroad, Structure Model Building, Structures on Hold · Tagged: Shipyard Brewery

Jan 14 2018

Build of Shipyard Brewery – 2 of 6

Weathered the rest of the walls tonight, painted, then stained and then glued on the windows (all 22 of them), glued one side/end wall to the front wall, and one side/end wall to the rear/back wall. Now need to glue each “L” section to each other, forming the building rectangle. The roof is just mocked […]

Written by bswadmin · Topics: Model Railroad, Structure Model Building, Structures on Hold · Tagged: Shipyard Brewery

  • Page 1
  • Page 2
  • Go to Next Page »

Primary Sidebar

Recent Posts

  • Hertz bankruptcy May 24, 2020
  • Thrivent reflections – followup to a post from 2019-05-24 May 24, 2020
  • Reading, and Wikipedia May 24, 2020
  • quote from randy peprock re pandemic re-opening May 22, 2020
  • Vigilante murder in Georgia May 14, 2020

Archives

Categories

Recent Comments

  • Edward Anderson on Homeless people or others asking for handouts, downtown
  • Edward Anderson on Voting for a third party candidate or not voting at all
  • Brian on Voting for a third party candidate or not voting at all
  • Brian on Voting for a third party candidate or not voting at all
  • Brian on Voting for a third party candidate or not voting at all

Meta

  • Register
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Footer

Posts by topic

Posts by month

Search the Attitude!

  • Return Home Here!

Post Calendar

May 2025
S M T W T F S
 123
45678910
11121314151617
18192021222324
25262728293031
« May    

BigB’s Profile

********************Lailah's & Ruby's GranPaBrian; Software Development Geek; wannabe Model Railroader; unsuccessful Photographer.

  • Return to Top
  • Activities
  • Career
  • Interests
  • Structure Kit Building
  • Misc.
  • Return to home

Copyright © 2025 · Altitude Pro on Genesis Framework · WordPress · Log in