Worked on shingling the main roof tonight. Also, built the dormer (both front and rear), as well as the two clerestory things. You can see the front dormer and the front clerestory here on the shingled front roof. Still have to shingle the rear main roof, then glue on the rear dormer and rear clerestory. Both dormers and both clerestory’s need tarpaper roofing material added to them – or maybe the diamond shingles – not sure which way to go yet. Putting on these tiny strips of shingles is very time consuming, need a lot of patience. But, the coloring of them turned out better than expected.