[don’t read this – it’s just totally random and miscellaneous thoughts] It’s really been a strange week for me (for a variety of reasons) – I’m off on vacation all week, and have been doing a lot of physical hard labor (over a period of a few days), and I’m just exhausted from it – […]
Model Railroad
Initial build of Goober’s Towing from KC Workshop
Started this kit tonight, took less than 2 hours to get this far. Braced the interior walls, primed the exterior walls with gray primer. Dry brushed on the green paint, put some “white” on a sponge and splotged / textured the green paint, weathering it. Glued on acetate onto the interior walls over the window […]
Build of Shipyard Brewery – 6 of 6
After not touching this project for the last week or so, as soon as I got home tonite, I sat down at the project table and started working on this effort again. Finished all the shingling of the front and rear main roofs, shingled the two dormers (front/rear) and glued them on. Added rolled tar […]
Build of Shipyard Brewery – 5 of 6
Worked on shingling the main roof tonight. Also, built the dormer (both front and rear), as well as the two clerestory things. You can see the front dormer and the front clerestory here on the shingled front roof. Still have to shingle the rear main roof, then glue on the rear dormer and rear clerestory. […]
Build of Shipyard Brewery – 4 of 6
Added the roofs and tarpapered them, for the two extensions, and for the two enclosed exterior staircases. Still need to weather them. Added a middle vertical “plank” to each end to cover up the seams that were created when I joined the front half to the rear half. Shouldn’t point this out, while it looks […]